UPSC MainsMANAGEMENT-PAPER-II20145 Marks
Q10.

If the lead time is 9 days, what is the reorder level?

How to Approach

This question tests the understanding of fundamental inventory management concepts. The approach should involve defining reorder level, explaining its calculation, and applying the given lead time to arrive at the answer. The answer should be concise and directly address the question, demonstrating a grasp of operational management principles. Focus on the formula and its application.

Model Answer

0 min read

Introduction

Inventory management is a critical aspect of operations management, ensuring the availability of materials to meet demand while minimizing costs. A key component of effective inventory control is determining the optimal reorder level. The reorder level signifies the inventory level at which a new order should be placed to avoid stockouts, considering the time it takes to receive the order – known as the lead time. Without knowing the demand rate, we can only calculate the reorder point based on lead time and daily usage.

Reorder Level Calculation

The reorder level (ROL) is calculated to determine when to place a new order. It’s a crucial element in inventory control, preventing stockouts during the lead time. The basic formula for calculating the reorder level is:

Reorder Level = Lead Time × Demand Rate

In this specific scenario, the lead time is given as 9 days. However, the question does not provide the demand rate (average daily demand). Therefore, we can only express the reorder level in terms of the demand rate.

Applying the Given Lead Time

Let 'D' represent the average daily demand. Substituting the given lead time into the formula, we get:

Reorder Level = 9 × D

Therefore, the reorder level is 9 times the average daily demand. Without knowing the demand rate, we cannot calculate a numerical value for the reorder level. The answer remains expressed as a function of the daily demand.

Example Scenario

To illustrate, if the average daily demand (D) is 100 units, then:

Reorder Level = 9 × 100 = 900 units

This means a new order should be placed when the inventory level drops to 900 units.

Importance of Accurate Demand Forecasting

Accurate demand forecasting is paramount for effective reorder level calculation. Inaccurate forecasts can lead to either stockouts (if the reorder level is set too high) or excessive inventory holding costs (if the reorder level is set too low). Techniques like moving averages, exponential smoothing, and regression analysis are commonly used for demand forecasting.

Factors Affecting Reorder Level

  • Lead Time Variability: Uncertainty in lead time requires a safety stock to be added to the reorder level.
  • Demand Variability: Fluctuations in demand also necessitate safety stock.
  • Service Level: The desired probability of not experiencing a stockout influences the safety stock level.
  • Cost of Stockout: Higher stockout costs justify a higher service level and, consequently, a higher reorder level.

Conclusion

In conclusion, given a lead time of 9 days, the reorder level is calculated as 9 times the average daily demand. While a precise numerical value cannot be determined without knowing the demand rate, understanding the formula and its application is crucial for effective inventory management. Accurate demand forecasting and consideration of factors like lead time variability and service level are essential for optimizing the reorder level and minimizing inventory costs.

Answer Length

This is a comprehensive model answer for learning purposes and may exceed the word limit. In the exam, always adhere to the prescribed word count.

Additional Resources

Key Definitions

Lead Time
The time interval between placing an order and receiving it. It includes order processing time, transit time, and receiving/inspection time.
Economic Order Quantity (EOQ)
A calculation used to determine the optimal order quantity to minimize total inventory costs, including ordering costs and holding costs.

Key Statistics

Inventory costs typically represent 20-30% of total working capital for many businesses (Source: APICS, 2023 - knowledge cutoff).

Source: APICS (Association for Supply Chain Management)

Globally, supply chain disruptions caused by the COVID-19 pandemic led to an average increase of 15% in lead times across various industries (Source: McKinsey, 2022 - knowledge cutoff).

Source: McKinsey & Company

Examples

Just-in-Time (JIT) Inventory

Toyota's implementation of JIT inventory management significantly reduced inventory holding costs by receiving materials only when needed for production. This requires extremely reliable lead times and close supplier relationships.

Frequently Asked Questions

What is safety stock?

Safety stock is extra inventory held to buffer against uncertainties in demand and lead time. It helps prevent stockouts when actual demand exceeds forecasts or lead times are longer than expected.

Topics Covered

Operations ManagementEconomicsInventory ControlInventory PlanningLead TimeSafety Stock