W can do 25% of a work-in 30 days, X can do 1/4 of the work in 10 days, Y can do 40% of the work in 40 days and Z can do 1/3 of the work in 13 days. Who will complete the work first?
- AW
- BX
- CY
- DZCorrect
Explanation

Related questions
More UPSC Prelims practice from the same subject and topic.
- Prelims 2016CSATQuantitative Aptitude
There is an order of 19000 quantity of a particular product from a customer. The firm produces 1000 quantity of that product per out of which 5% are unfit for sale. In how many days will the order be …
- Prelims 2016CSATQuantitative Aptitude
Ram and Shyam work on a job together for four days and complete 60% of it. Ram takes leave then and Shyam works for eight more days to complete the job. How long would Ram take to complete the entire …
- Prelims 2016CSATQuantitative Aptitude
There are five hobby clubs in a college — photography, yachting, chess, electronics and gardening. The gardening group meets every second day, the electronics group meets every third day, the chess gr…
- Prelims 2016CSATQuantitative Aptitude
There are some nectar-filled flowers on a tree and some bees are hovering on it. If one bee lands on each flower, one bee will be left out. If two bees land on each flower, one flower will be left out…
- Prelims 2016CSATQuantitative Aptitude
A class starts at 11:00 am and lasts till 2:27 pm. Four periods of equal duration are held during this interval. After every period, a rest of 5 minutes is given to the students. The exact duration of…
- Prelims 2016CSATQuantitative Aptitude
30g of sugar was mixed in 180 ml water in a vessel A, 40 g of sugar Was mixed in 280 ml of water in vessel B and 20 g of sugar was mixed in 100 ml of water in vessel C. The solution in vessel B is